GOOD
POLITICS
KERALA
Minister directs PWD to complete ongoing road construction in Edamalakkudy tribal panchayat
The Minister set a definitive 45-day deadline to finish the remaining 1.35-kilometre stretch of road connecting Pettimudy to Edalippara, which serves the tribal panchayat.
Read the original at The Hindu · Kerala ↗