BAD
INDIA
Delhi-Dehradun Expressway washed away in first monsoon rains
The Delhi-Dehradun Expressway, which was completed on April 14 at a cost of ₹12,000 crore with the hard work of the public, has come down drastically in parts in less than two months. It is as if two meteorites have fallen or the road has l
Read the original at आज तक ↗