BAD
INDIA
Approach road in Dehradun repaired in 12 hours, vehicles run again after bridge collapse
The approach road that was damaged due to rain in Dehradun has been repaired in just 12 hours.
Read the original at TV9 भारतवर्ष ↗The approach road that was damaged due to rain in Dehradun has been repaired in just 12 hours.
Read the original at TV9 भारतवर्ष ↗