GOOD
INDIA
40% of the construction work of the cable bridge at Mir Alam Talab has been completed.

The beautification and development works of both the islands of the lake were carried out in parallel.
Read the original at سیاست ↗
The beautification and development works of both the islands of the lake were carried out in parallel.
Read the original at سیاست ↗